Microsoft Project logo

Microsoft Project

Microsoft Project is a longstanding project management application for scheduling, resource planning, and tracking complex projects, available as cloud subscriptions or desktop licenses.

4.4on Capterra · as of July 2026

What is Microsoft Project?

Microsoft Project is the oldest name in project management software, dating to 1984, and it remains the reference point for one specific job: building and maintaining a real schedule. Where tools like Asana and Trello track tasks, Project computes them. Enter durations, link dependencies, assign resources, and the scheduling engine calculates start and finish dates, flags the critical path, and recalculates the entire plan when anything slips. That distinction, a scheduling engine versus a task list, is the whole reason Project still exists in a market full of friendlier tools.

It is aimed at professional project managers and PMOs delivering formal, dependency-heavy work: construction programs, product launches with hard dates, government contracts, anything where “what happens to the end date if this task slips a week” needs a computed answer rather than a guess.

The licensing shift: Planner absorbed Project for the web

Microsoft reorganized this product line, and buyers researching it will hit conflicting names, so here is the current shape. Microsoft folded its lightweight cloud offering, Project for the web, into a new unified Planner app that also absorbed Microsoft To Do and the old Planner. The result inside Microsoft 365 is one Planner app (used standalone or in Teams) with premium capabilities licensed on top.

The cloud tiers now read as: Planner Plan 1 (the successor to the old Project Plan 1), which adds premium plans with timelines, dependencies, and sprints inside the Planner app; Planner and Project Plan 3, the mainstream professional tier, which adds the full web scheduling experience, resource management, and rights to the Project Online desktop client; and Planner and Project Plan 5, the PMO tier, which adds portfolio selection, demand management, and enterprise resource planning. Entry pricing for Plan 1 is published around ten dollars per user per month, with Plan 3 roughly three times that and Plan 5 in the mid tens of dollars; confirm current figures on Microsoft’s pricing page because the packaging has moved more than once.

Separately, Microsoft still sells perpetual desktop licenses: Project Standard 2024 and Project Professional 2024, one-time purchases for organizations that refuse subscriptions. There is no free tier anywhere in the lineup, only trials.

Desktop versus web: genuinely different products

The desktop client (Windows only; there has never been a Mac version) is the full instrument: resource leveling, multiple baselines, earned value fields, custom calendars per resource, master projects with subprojects, and fine-grained control over how the engine schedules. It is also where the learning curve lives. The desktop client punishes casual use; users without training famously fight auto-scheduling, watch dates move for reasons they cannot see, and give up.

The web experience that ships with Plan 3 is deliberately simpler: grid, board, and timeline views, dependencies, and approachable resource assignment. It is far easier to learn and far less capable. Complex programs still get built on desktop and reported from the cloud. Buyers should be clear-eyed that “Microsoft Project” is really these two products sharing a license, and teams expecting desktop power in the browser will be disappointed.

Power BI and Project Online reality

Reporting is a genuine strength, with a caveat. Project’s cloud data flows into Power BI, and Microsoft publishes Power BI templates that produce portfolio dashboards, resource heatmaps, and timeline reports that most standalone PM tools cannot match. For an organization already paying for Power BI, this is a serious advantage: project data joins the same reporting estate as finance and operations data.

The caveat is Project Online, the older SharePoint-based PPM platform that many enterprises still run. It remains in service and Plan 3 and 5 subscriptions still include access, but Microsoft’s development energy has visibly moved to the new Planner platform. Organizations deciding today should build on the Planner-based experience rather than starting new deployments on Project Online, and existing Project Online shops should plan for an eventual transition on Microsoft’s timetable rather than assume indefinite parity.

Real limitations

The learning curve is the big one and it is not marketing modesty. Critical path scheduling requires understanding the model (task types, constraints, leveling), and organizations that roll Project out to general staff see it rejected. It belongs in the hands of the few people who plan, with everyone else consuming views through Teams, Power BI, or exported timelines.

Mobile is weak: there is no full-featured Project mobile app, and phone access to premium plans through Teams covers viewing and light edits at best. Collaboration is also not the product’s native grammar. Comments, approvals, and the everyday back-and-forth that Asana handles gracefully feel bolted on, which is why Project so often runs alongside a collaboration tool rather than replacing one. And outside a Microsoft 365 shop, most of the ecosystem value evaporates; buying Project without Teams and Power BI around it forfeits its best arguments.

Microsoft Project vs Smartsheet and Asana for scheduling-heavy work

Against Smartsheet, the question is how much engine you need. Smartsheet does real dependencies, critical path, and baselines in a spreadsheet-shaped interface that ordinary contributors will actually update, and its collaboration and sharing are better. Project’s engine is deeper: resource leveling, scheduling control, and what-if rigor that Smartsheet does not attempt. PMOs running large formal programs pick Project; teams that need solid scheduling plus broad participation usually do better in Smartsheet.

Against Asana, the honest answer is that they are different categories wearing the same label. Asana’s timeline visualizes dates people typed in; it has no auto-scheduling, no leveling, no critical path. For coordinating cross-functional knowledge work, Asana is the better product and the better daily experience. For computing a defensible schedule with resource constraints, Asana is not a candidate and Project is the standard. Plenty of organizations correctly run both.

Who should use Microsoft Project, and who should skip it

Buy it if you have trained project managers, schedule-driven deliverables with real dependency math, and a Microsoft 365 estate to plug into. Plan 3 for working PMs, Plan 5 only when portfolio and demand management will genuinely be used, desktop perpetual licenses for the holdouts.

Skip it if your projects are coordination-shaped rather than schedule-shaped, if nobody on staff knows critical path methodology, if your teams live on Macs and phones, or if adoption by non-PMs is the goal. Asana, monday.com, or Smartsheet will fit those situations better at lower total cost.

The bottom line

Microsoft Project remains the benchmark scheduling engine, now sold through a confusing but workable Planner-branded tier structure with the desktop client still carrying the heavy load. Its depth is unmatched in mainstream software and so is its learning curve. For PMOs in Microsoft shops running formal, dependency-driven projects, it is still the professional standard. For everyone else, it is more instrument than they need.

Pros & cons

Pros

  • The strongest scheduling engine in mainstream project software
  • Deep integration with Teams, Power BI, and the Microsoft 365 stack
  • Cloud subscriptions and perpetual desktop licenses both available

Cons

  • Real learning curve; the desktop client assumes formal PM training
  • Licensing is confusing after the Planner consolidation
  • Weak mobile story and no Mac desktop client